ROSEMOUNT HOTEL
PROJECT DETAILS:
Supply temporary retention to facilitate the excavation of a new stair access and tunnel to an underground store room in the Rosemount Hotel whilst maintaining the existing structures.
CGI SCOPE:
-Carry out onsite testing.
-Provide site specific Engineering for the project.
-Install grout block to the engineers specification.
-Supervise the excavation.
-Supervise the cutting back of the grout block.
-After sales support.